The guys showed up, unexpectedly, late yesterday (Thursday) afternoon to solidify the parking area walls and prepare the ramp for concreting.  Each of the cells in the wall block was partially filled with fairly large rocks, then loose concrete was poured into the cells.


Strong wire mesh was cut and placed on the ramp, with boards secured at the top and bottom sections.  The rain was on its way soon and it didn't make sense to do too much more.
Filling the block cells with concrete
A closer look at the filled block cells and the ramp preparation
All done for the day


Everyone was here in the morning and things got going right away.  Chris and Tony worked on plastering the parking area walls, while Johnny and Ryan spread out soil at the back of the driveway.  The driveway is going to be transformed into a yard for Jason and Tina, so we'll end up just having a parking area out front when the project is completed.
Tony plasters one of the parking area walls
Ryan evens out the soil for the new apartment yard
Johnny spreads out the soil


A little while later, Barbara and Kari brought down a "Thank You" cake to present to the guys, since everyone was here at that time.  We have really appreciated all the work that Sea Link has done for us and wanted to reward them with a special treat.  This renovation project is coming to an end within the next few days and we'll really miss having the guys around here. Each of them has worked very hard the entire time and the quality of their work speaks for itself.
Johnny, John Sr., Ryan, Chris and Tony - The Sea Link Team!
Kari and Barbara pose with the guys
The cake, baked and decorated by Barbara


Okay guys, break time is over - get back to work!!  Did I sound like a tough construction supervisor?  No?  Oh well, guess I should just concentrate on taking the pictures!


Later in the morning, the truck arrived with a load of concrete for the ramp.  It was a strong mixture and set up very quickly, which was lucky because the rain was threatening.
The cement truck backs into the parking area
Johnny, Tony and Chris move the chute in place
The guys spread out the concrete
Chris and Tony work on the top section of the ramp
Pouring concrete for the lower section of the ramp
Tony and Chris level out the concrete
The ramp is concreted and looking great
The parking area walls have all been plastered


The weather hasn't been too kind this week, but as you can see, the guys still managed to get a lot of things done anyway.  I wasn't at home when they left today, so don't know when they'll return.  But, I don't think anyone will see them until at least Monday, particularly after they polish off that cake tonight!

No comments:

Post a Comment